Skip to main content

Company name

Rutas del Valle

Project number

14017-01

Category A projects could result in potentially significant environmental and/or social risks and impacts, which are diverse, irreversible, or unprecedented that may extend beyond the boundaries of the actual project site or facilities. In principle, Category A includes projects which have significant impacts on protected or sensitive areas21 and/ or vulnerable groups.

E&S category
tooltip

A

Country

Colombia

Sector

Transport

Status

Inactive

Disclosed date

04/26/2022

Projected date at which a project will be put forward for the Board of Executive Directors’ approval.

Projected board date
tooltip

06/28/2022

Approval date

N/A

Signed date

N/A

Sponsoring entity

N/A

Investment Operations Department Contact

N/A

Investment type

Syndicated amount

N/A

Financing amount

USD $ 101,519,000

Currency

COP

Project scope and objective

The new Valle del Cauca Road Network – Cali and Palmira Access Roads (the “Project” or the “Rutas del Valle”) is the first project granted under the fifth generation concessions program led by the Government of Colombia through the National Infrastructure Agency (Agencia Nacional de Infraestructura, “ANI)”. The Project, mainly aimed at improving the road network around the cities of Cali and Palmira, was granted in May 2021 to Sociedad Concesionaria Rutas del Valle S.A.S. (the “Concessionaire”), formed by Rodovías Colombia (Patria Investments affiliate) (70%) and Mercantil Colpatria (30%). The Project has a maximum term of 29 years, which may be shorter if the current revenue level is reached for the eight existing tolls as presented in the Project bid. It should be noted that no new tolls will be installed, and existing rates will not be increased either.

For inquiries, comments and information requests about the project

Request information

Learn more about how we provide private-sector solutions in the region .

Early disclosure

For projects with high environmental or social risk an Environmental and Social Strategy (ESS) is prepared early on during the project appraisal and prior to carrying out the environmental and social due diligence (ESDD). The ESS includes the initial E&S risk categorization and a brief description of potential Performance Standards applicable to the project. The ESS for this project is available below. Together with the ESS, IDB Invest also provides access to the client’s preliminary E&S documents that will be reviewed during the ESDD. The client E&S documents for this project can be found under the “CLIENT FILES” section below. Once the environmental and social due diligence is completed, an Environmental and Social Review Summary (ESRS) for the Project will be published on this page.

RUTAS DEL VALLE - ENVIRONMENTAL AND SOCIAL STRATEGY (ESS)

144.0 Kb

Client files

This section provides the key environmental and social assessment documents produced by the client for this project.

EIA UF4 CAP 01 OBJETIVOS

233.6 Kb

EIA UF4 CAP 02 GENERALIDADES

937.5 Kb

EIA UF4 CAP 04 AREAS INFLUENCIA

3.3 Mb

EIA UF4 CAP 05.1 MEDIOABIOTICO

9.1 Mb

EIA UF4 CAP 05.2 MEDIO BIOTICO

4.0 Mb

EIA UF4 CAP 05.3 MEDIO SOCIOECONOMICO

5.2 Mb

EIA UF4 CAP 05.4 SERVICIOS ECOSISTÉMICOS

695.2 Kb

EIA UF4 CAP 06. ZONIFICACION AMBIENTAL

1.2 Mb

EIA UF4 CAP 07. APROVECHAMIENTO RRNN

1.9 Mb

EIA UF4 CAP 08. EVALUACIΑN AMBIENTAL

1.6 Mb

EIA UF4 CAP 09. ZONIFICACI0N AMBIENTAL

369.4 Kb

EIA UF4 CAP 011.1.1 PROGRAMA MANEJO

3.6 Mb

EIA UF4 CAP 011.1.3 GESTION DE RIESGO

1.5 Mb

EIA UF4 CAP 011.1.4 DESMANTELAMIENTO Y ABANDONO

300.6 Kb

EIA UF4 CAP 011.2.1 INVESTION 1%

136.4 Kb

EIA UF4 CAP 011.2.2 COMPENSACION BIODIVERSIDAD

430.7 Kb

EIA UF4 CAP 011.2.3 MANEJO DERRAMES

1.9 Mb

EIA UF4 CAP 011.2.4 MANEJO RESIDUOS DEMOLICION

463.1 Kb

PAGA UF0 CAP 01 - INTRODUCCIÓN

480.7 Kb

PAGA UF0 CAP 02 - DESCRIPCIÓN DEL PROYECTO

4.3 Mb

PAGA UF0 CAP 03 - LÍNEA BASE

7.8 Mb

PAGA UF0 CAP 04 - EVALUACIÓN IMPACTOS

401.3 Kb

PAGA UF0 CAP 05 - PROGRAMAS DE MANEJO

748.1 Kb

PAGA UF0 CAP 06 - PERMISOS AMBIENTALES

517.7 Kb

PAGA UF0 CAP 07 - PLAN DE CONTINGENCIAS

2.8 Mb

PAGA UF0 CAP 08 - CRONOGRAMA

267.7 Kb

PAGA UF0 CAP 10 - BIBLIOGRAFÍA

234.5 Kb

PAGA UF01 CAP 09 - PRESUPUESTO

220.1 Kb

EIA UF4 CAP 03 DESC. PROYECTO

6.8 Mb

For inquiries, comments and information requests about the project

Request information

Learn more about how we provide private-sector solutions in the region .

Contact information

For inquiries, comments and information requests about the project

Request information

Alternatively, you may also use the following contact information :

Client Contact

EMAIL

N/A

PHONE NUMBER

N/A

POST OFFICE ADDRESS

N/A

IDB Invest Contact

EMAIL

requestinformation@idbinvest.org

PHONE

+1(202)-566-4566

ADDRESS

1350 New York Ave NW, Washington, DC 20005

For inquiries, comments and information requests about the project

Request information

Learn more about how we provide private-sector solutions in the region .